PLC & control panels, built to run for a decade.
Panel design, field wiring, PLC and HMI programming, SCADA screens, and retrofits on machines old enough that the original supplier no longer answers the phone. One engineer, drawing to dry run.
Six steps, one point of contact.
- 01Panel design & build
GA drawings, single-line diagrams, BOM, and IP-rated enclosures sized to the actual load — not a generic template.
- 02Field wiring
Point-to-point wiring with a numbered cable schedule, proper wire management, and continuity testing before power-on.
- 03PLC programming
Ladder or structured-text logic across Siemens, Allen-Bradley, Delta, Mitsubishi and Schneider platforms, commented for the next engineer.
- 04HMI & SCADA screens
Operator screens built around how your line actually runs — alarm banners, recipe handling, changeover flows.
- 05Retrofit & obsolescence
Replacing unsupported PLCs, relay logic or discontinued HMIs on machines the original OEM no longer services.
- 06Commissioning & handover
Dry run, load trial, then panel GA, program backups and parameter lists handed to you — no locked blocks.
Often paired with
Have a panel that needs replacing?
Send us the machine, the make and what's failing. We'll tell you whether it's a repair, a retrofit, or a full rebuild before we quote anything.