BREAKDOWN HELPLINE OPEN — 24×7 +91 00000 00000  ·  snipersolutions3@gmail.com
SNIPERSOLUTIONS Book a site survey
Home Services Industries Work Support & AMC About Careers Contact Book a site survey
PLC · Drives · Robotics · Industrial IoT

Automation that survives the third month.

We install, wire and commission control panels, VFDs, robot cells and plant networks across the Pune belt — then hand over documentation your team can actually run on.

Typical response: same working day
On site across Chakan · Ranjangaon · Talegaon · Shirwal

Platforms we commission on

SIEMENSALLEN-BRADLEYDELTAMITSUBISHISCHNEIDERABBFANUCOMRONYASKAWAIGNITIONNODE-RED
§ 03 — Selected work

Jobs, and what they actually changed.

A sample of recent commissioning work across drives, robotics and IIoT. Full write-ups on the work page.

Placeholder — describe the fault the plant was living with, what you replaced, and how you tuned it. Two or three sentences is enough.

00%fewer overload trips
0 hrsline downtime
Services used
VFD sizingParameter tuningField wiringOperator training

Placeholder — cell scope, the safety scheme you built, and the cycle time you achieved on trials.

00scycle time achieved
0 daysarrival to production
Services used
Cell layoutEOAT fitmentSafety interlocksTeach programming

See all work

§ 04 — How we work

The parts that show up two years later.

Anything runs on handover day. These are the choices that decide whether it still runs when the engineer who built it has moved on.

The surveyor is the commissioner

The engineer who walks your line and quotes the job is the one who wires and commissions it.

Drawings before wire is cut

Panel GA, cable schedule and BOM go to you for approval first — every time.

Brownfield is the default assumption

We plan cutover around your production plan, not the other way round.

Backups and parameters are yours

PLC and HMI backups, drive parameter lists and commented logic at handover. No locked blocks.

More on how we work

§ 05 — Process

Four stages, a named engineer, a dated plan.

0Plants supported
0Panels commissioned
0Typical response
24×7Breakdown helpline
STAGE 01

Site survey

We walk the line, measure loads and photograph the existing panel before quoting anything.

STAGE 02

Design & quote

Panel GA, cable schedule, BOM and a fixed price. You approve drawings before a wire is cut.

STAGE 03

Install & commission

Wiring, programming, dry runs and load trials — scheduled inside your shutdown window.

STAGE 04

Handover & support

Backups, drawings, parameter lists, operator training, then a number a human answers.

Line down

Line down right now?

The helpline is not a ticket queue. An engineer who has worked on drives and panels picks up, asks for the fault code, and tells you whether it needs a visit.