Site survey
We walk the line, measure loads and photograph the existing panel before quoting anything.
We install, wire and commission control panels, VFDs, robot cells and plant networks across the Pune belt — then hand over documentation your team can actually run on.
Typical response: same working day
On site across Chakan · Ranjangaon · Talegaon · Shirwal
Platforms we commission on
Nothing gets lost between vendors, because the engineer who surveys the job is the one who wires and commissions it. Six capability areas — each with its own page below.
Panel build, field wiring, PLC and HMI programming, SCADA screens, and retrofits on ageing machines that no longer have a supplier.
Sizing, mounting, cabling, parameter setting and tuning — plus fault-code cleanup on drives that keep tripping and nobody can say why.
Cell layout, mounting, EOAT fitment, fencing and interlocks, teach programming and cycle-time trials.
Machine data collection, downtime and OEE dashboards, edge gateways, Modbus and OPC-UA integration.
Industrial switching, cabling, VLAN segmentation between OT and IT, and remote access done safely.
24×7 helpline, remote diagnostics, spares advice, and annual maintenance contracts with defined response times. This is the part most integrators treat as an afterthought — it is the reason our customers call us back.
Every sector has one constraint that dictates the whole job. Knowing which one it is before the survey is most of the work.
A sample of recent commissioning work across drives, robotics and IIoT. Full write-ups on the work page.
Placeholder — describe the fault the plant was living with, what you replaced, and how you tuned it. Two or three sentences is enough.
Placeholder — cell scope, the safety scheme you built, and the cycle time you achieved on trials.
Anything runs on handover day. These are the choices that decide whether it still runs when the engineer who built it has moved on.
The engineer who walks your line and quotes the job is the one who wires and commissions it.
Panel GA, cable schedule and BOM go to you for approval first — every time.
We plan cutover around your production plan, not the other way round.
PLC and HMI backups, drive parameter lists and commented logic at handover. No locked blocks.
We walk the line, measure loads and photograph the existing panel before quoting anything.
Panel GA, cable schedule, BOM and a fixed price. You approve drawings before a wire is cut.
Wiring, programming, dry runs and load trials — scheduled inside your shutdown window.
Backups, drawings, parameter lists, operator training, then a number a human answers.
The helpline is not a ticket queue. An engineer who has worked on drives and panels picks up, asks for the fault code, and tells you whether it needs a visit.